Gyprock installation commenced on Tuesday. The whole house was gyprocked in 1 day surprisingly. They were back the next day for setting of the gyprock and today the cornices were installed upstairs. Square set downstairs. Outside steps were also bricked up.
Walking through the house today feels so much different now, with the walls and roof gyprocked it looks great.
Future schedule
26th Aug- Stairs
27th Aug- Lock up
28th Aug- waterproofing wet areas
1st Sep - Kitchen
|
Leisure Room |
|
Square Set around Doors and windows |
|
Kitchen |
|
Hallway |
|
Dining room |
|
Media Room with podium |
|
Hallway from Entry |
|
Ensuite bath |
|
Ensuite |
|
Master Bedroom |
|
Powder Room |
|
Bathroom
|
Hi! good progress :)
ReplyDeleteDo you have any picture of the powder, or any other bathroom?
I was wondering the position of the shower..
thanks!
The pics of the powder room and bathroom are a bit dark although I will add them above :)
ReplyDeleteThat looks so good. I can't wait until ours is at your stage!
ReplyDeleteThanks kidsbuggingme. Not long till you get to this stage also. I can't wait till it's all done.
ReplyDelete